jljae.blogg.se

Etank with smart charger
Etank with smart charger














ETANK WITH SMART CHARGER PDF

Print, Copy, Scan, Fax, ADF and Wireless Print languagesģ5-sheet ADF Scan to PDF Two-sided printing Target user and print volumeįor teams up to 3 users Prints up to 1200 pages/month Borderless printing HP recommends that the number of pages per month of imaged output be within the stated range for optimum device performance, based on factors including supplies replacement intervals and device life over an extended warranty period. Input voltage: 100 to 240 VAC (+/- 10%), 50/60 Hz (+/- 3 Hz) Power ConsumptionĠ.1 watts (off) 1.10 watts (sleep) Power supply type HP 32 90-ml Black bottle (~4000 pages), HP 32XL 135-ml Black bottle (~6000 pages), HP 31 70-ml Cyan bottle (~8000 pages), HP 31 70-ml Magenta bottle (~8000 pages), HP 31 70-ml Yellow bottle (~8000 pages) For more information about fill and yield see Print colors maximum Pigment-based (black) Dye-based (color) Print headsĢ (1 each black, tri-color) Color(s) of printing suppliesīlack Cyan Magenta Yellow Print head nozzlesħ04 (Black), 588 (Tri-color) Replacement cartridges Up to 3.5 ipm (color) Up to 8 ipm (mono) Technology Up to 8 ipm (200 ppi, mono) Up to 3.5 ipm 200 ppi, color) Scan speed (normal, A4) Up to 20 sheets Maximum output capacity (envelopes)ģ inch (76.2 mm) Touchscreen MGD (Mono Graphics Display) Scan speed (normal, letter) Up to 20 sheets Maximum output capacity (labels) Up to 30 cards Standard output capacity (labels) Up to 30 cards Standard output capacity (cards) Up to 30 sheets Maximum output capacity (cards) Up to 20 sheets Maximum output capacity (photo paper) Up to 30 cards Maximum input capacity (labels) Up to 250 sheets Standard input capacity (cards) Up to 50 sheets Standard input capacity (legal) Up to 50 sheets Maximum input capacity (photo paper) Up to 250 sheets Standard output capacity (legal) Up to 30 envelopes Maximum input capacity (sheets) Up to 250 sheets Paper handling output, standardġ00-sheet output tray Standard output capacity (envelopes) Up to 100 sheets Paper handling input, standard Up to 100 sheets Maximum output capacity (sheets) If it is not air charged properly it will result in premature failure of your well pump, not to mention low pressure and possibly a noisy system.Print scan copy and fax Envelope input capacity The proper air pressure in your tank is one of the most vital parts of your well system. With little ease he can also evaluate the rest of the pumping system to prevent further problems. Not only will it insure the job is done properly. It is highly recommended that a trained technician air charge your pressure tank. Note: You may experience dirty discolored water, staining or plugging up of fixtures after recharging a pressure tank. You have now air charged your pressure tank.

  • Water conditioning units may be placed back into service.
  • Now open hose spigot/sample tap to drain again.
  • Wait until the pumping system has completely turned off.
  • Switch power back on and allow pumping system to build up to the cut off pressure.
  • Turn off hose spigot/sample tap and add proper amount of air into tank Your system has now been re-pressurized.
  • Apply a small amount of psi with air compressor to snifter valve to completely evacuate pressure tank of all water.
  • Open a hose spigot or the sample tap to drain tank.
  • This is a very important step, to prevent plugging up conditioning units with sediment.
  • Bypass all water conditioning equipment.
  • This is done by switching off disconnect box to water/pumping system or by a breaker located in the electrical service box marked pump/water system. Your determined amount of pressure is 2lbs less the cut in pressure(ex:40-60 switch would require 38psi with tank empty) The standard settings are 20-40 or 30-50 or 40-60.

    etank with smart charger

    When the pumping system turns off this is your cut off pressure.

    etank with smart charger

    When the pumping system turns on this is your cut in pressure. This is determined by running the water and watching the pressure gauge.

  • In order to re-pressurize your system properly you must know the cut in and cut out pressure settings.
  • Step by Step Guide to Aircharge Your Pressure Tank














    Etank with smart charger